16 questions0 / 16 done
- 1ME 2024 · 1 mark · MCQ · EasyThe phases present in pearlite are
- 2ME 2024 · 1 mark · MCQ · EasyThe “Earing” phenomenon in metal forming is associated with
- 3ME 2024 · 1 mark · MCQ · EasyThe grinding wheel used to provide the best surface finish is
- 4ME 2024 · 1 mark · MCQ · EasyThe allowance provided to a pattern for easy withdrawal from a sand mold is
- 5ME 2024 · 1 mark · MCQ · EasyThe most suitable electrode material used for joining low alloy steels using Gas Metal Arc Welding (GMAW) process is
- 6ME 2024 · 1 mark · MCQ · EasyThe preparatory functions in Computer Numerical Controlled (CNC) machine programing are denoted by the alphabet
- 7ME 2024 · 1 mark · MCQ · ModerateA set of jobs U,V,W,X,Y,Z arrive at time t=0 to a production line consisting of two workstations in series. Each job must be processed by both workstations in sequence (i.e., the first followed by the second). The process times (in minutes) for each job on each workstation in the production line are given below.
- 8ME 2024 · 1 mark · MCQ · EasyA queueing system has one single server workstation that admits an infinitely long queue. The rate of arrival of jobs to the queueing system follows the Poisson distribution with a mean of 5 jobs/hour. The service time of the server is exponentially distributed with a mean of 6 minutes. In steady state operation of the queueing system, the probability that the server is not busy at any point in time is
- 9ME 2024 · 2 marks · MCQ · ModerateA company orders gears in conditions identical to those considered in the economic order quantity (EOQ) model in inventory control. The annual demand is 8000 gears, the cost per order is 300 rupees, and the holding cost is 12 rupees per month per gear. The company uses an order size that is 25% more than the optimal order quantity determined by the EOQ model. The percentage change in the total cost of ordering and holding inventory from that associated with the optimal order quantity is
- 10ME 2024 · 2 marks · MCQ · ModerateAt the current basic feasible solution (bfs) v0 (v0∈R5), the simplex method yields the following form of a linear programming problem in standard form.
- 11ME 2024 · 2 marks · NAT · ModerateA cutting tool provides a tool life of 60 minutes while machining with the cutting speed of 60m/min. When the same tool is used for machining the same material, it provides a tool life of 10 minutes for a cutting speed of 100m/min. If the cutting speed is changed to 80m/min for the same tool and work material combination, the tool life computed using Taylor’s tool life model is ____ minutes (rounded off to 2 decimal places).
- 12ME 2024 · 2 marks · NAT · EasyAluminium is casted in a cube-shaped mold having dimensions as 20mm×20mm×20mm. Another mold of the same mold material is used to cast a sphere of aluminium having a diameter of 20mm. The pouring temperature for both cases is the same. The ratio of the solidification times of the cube-shaped mold to the spherical mold is ____ (answer in integer).
- 13ME 2024 · 2 marks · NAT · EasyA blanking operation is performed on C20 steel sheet to obtain a circular disc having a diameter of 20mm and a thickness of 2mm. An allowance of 0.04 is provided. The punch size used for the operation is ____ mm (rounded off to 2 decimal places).
- 14ME 2024 · 2 marks · NAT · ModerateIn an arc welding process, the voltage and current are 30V and 200A, respectively. The cross-sectional area of the joint is 20mm2 and the welding speed is 5mm/s. The heat required to melt the material is 20J/s. The percentage of heat lost to the surrounding during the welding process is ____ (rounded off to 2 decimal places).
- 15ME 2024 · 2 marks · NAT · ModerateA flat surface of a C60 steel having dimensions of 100mm (length) ×200mm (width) is produced by a HSS slab mill cutter. The 8-toothed cutter has 100mm diameter and 200mm width. The feed per tooth is 0.1mm, cutting velocity is 20m/min and depth of cut is 2mm. The machining time required to remove the entire stock is ____ minutes (rounded off to 2 decimal places).
- 16ME 2024 · 2 marks · NAT · ModerateIn a supplier-retailer supply chain, the demand of each retailer, the capacity of each supplier, and the unit cost in rupees of material supply from each supplier to each retailer are tabulated below. The supply chain manager wishes to minimize the total cost of transportation across the supply chain.