Soil Consolidation
Geotechnical Engineering
0
/ 1 done
1
CE 2024 Set 1 · 2 marks · NAT · Moderate
The total primary consolidation settlement (
S
c
S_c
S
c
) of a building constructed on a
10
m
10\,\mathrm{m}
10
m
thick saturated clay layer is estimated to be
50
m
m
50\,\mathrm{mm}
50
mm
. After
300
d
a
y
s
300\,\mathrm{days}
300
days
of the construction of the building, primary consolidation settlement was reported as
10
m
m
10\,\mathrm{mm}
10
mm
. The additional time (in days) required to achieve
50
%
50\%
50%
of
S
c
S_c
S
c
will be ____ (
rounded off to the nearest integer
).